This project involved replacement of deck and substructure repairs for Structure No. 0725-163 (Ramp 3), Structure No. 0725‐171 (Ramps 5&6) and Structure No. 0725-164 (Ramp 5). AREA worked as a sub-consultant to TYLin and carried out a field inspection to identify substructure deterioration areas and prepare substructure rehabilitation plans. AREA was also responsible for designing the jacking details and notes to jack up the existing bridge in order to remove, AREA was also responsible for designing the jacking details and notes to jack up the existing bridge in order to remove and replace the existing bearing.